The leading engineering solution provider in Bangladesh with local competence.

CONSTRUCTION-----------------------------------------------------------------------------------------------------------------------------------------Packaged vertical Water Tube 2/3 pass Boiler.

BURNER---------------------------------------------------------------------------------------------------------------------------------------------------Complete packaged burner for on/off operation.

INSULATION AND FINISHING----------------------------------------------------------------------------------------------------------------------- The boiler shall be insulated with 50mm thick rockwool and claded with painted powder coated metallic sheet.

SAFETY-----------------------------------------------------------------------------------------------------------------------------------------------------Against over pressure, low water level, no air flow to burner and power failure.

PRESSURE CONTROLS--------------------------------------------------------------------------------------------------------------------------------For controls of burner with set pressure limit. ..

BOILER FEED WATER PUMP-------------------------------------------------------------------------------------------------------------------------Suitable for working at high pressure.

CONTROL PANEL----------------------------------------------------------------------------------------------------------------------------------------Mounted on the boiler casing, comprising of all foreign components.

EFFICIENCY------------------------------------------------------------------------------------------------------------------------------------------------Thermal efficiency 89% and fuel to steam efficiency 85% based on net calorific value of the fuel.

AFTER SALES SERVICE -------------------------------------------------------------------------------------------------------------------------------All our steam boilers are backed by our nation wide team of service technicians. Service include commissioning, maintenance contracts, breakdown calls, boiler/burner servicing and routine maintenance. Spare of all make/ brand are available through our customer service department.

DESIGN---------------------------------------------------------------------------------------As per Bangladesh Boiler Regulations. .................................

BOILER BODY-------------------------------------------------------------------------------Imported Boiler Grade Steel and Tube. .............................

OPERATION----------------------------------------------------------------------------------Fully automatic control.

WATER LEVEL CONTROLS-------------------------------------------------------------High/Low level control for feed water pump operation and extra low level for burner cut off.

MODEL
MEL 60WT
MEL 100WT
MEL 150WT
MEL 250WT
Boiler Capacity F&A 100`C
Kg/hr
60
100
150
250
Maximum Working Pressure
Psi
50
100
100
100
Design Pessure
Psi
75
100
100
100
Heating Surface
Sq.m
1.43
3.15
5.09
8.65
Fuel Consumption (Natural Gas)
SCMH
4.2
7.05
10.06
17.6
Fuel Consumption (Light Oil (HSD))
LPH
-
7.4
11
18
Volpf Water at NWL
Lit
17
57
84
164
Boiler Weight Dry
Kg
250
480
650
850
Boiler Weight NWL
Kg
267
537
741
1014
Safety Valve
mm
20
25
25
25
Main Steam Valve
mm
20
25
25
25
Blow down Valve
mm
1.25
25
25
25
Chimney outlet
mm
100
150
150
150
Power(Burner)
Kw
0.37
0.75
0.75
0.75/0.25
Power(Feed Water Pump)
Kw
0.75
1.1
1.1
1.5
Dimension (A)
mm
452
615
700
900
Dimension (B)
mm
1320
1460
1484
1517
Dimension (C)
mm
1680
2222
2246
1864
Dimension (D)
mm
1010
1200
1200
1300
Dimension (E)
mm
750
815
900
1017
**Because of constant endeavour for improvement the above data may vary from those quoted above and are therefore subjected to confirmation.
PRODUCT: VERTICAL WATER TUBE BOILER
Other Steam Boilers

TUBELESS STEAM BOILER

ELECTRIC STEAM GENERATOR

 

View Information
View Information
MEL Group is the pioneer and the largest boiler manufacturer in Bangladesh.
timer